News Flash Home
The original item was published from 2/14/2018 8:14:43 AM to 3/15/2018 12:00:01 AM.

News Flash

City News

Posted on: February 14, 2018

[ARCHIVED] Bike Trail Connector Feasibility Study Complete

bike route

   


The City of Loveland has received the completed feasibility study from KZF Design for the Pedestrian and Bicycle Feasibility Study. The concept of the  Pedestrian and Bicycle Bridge Feasibility Study was based on the premise of  whether the city could create a bike path from the Loveland Madeira Business Corridor that would allow residents to park at various common parking areas and bike into the downtown district.  The  intent was to increase visitors into the district, while reducing vehicle traffic and parking.  The city was able to secure grant funding in the amount of $19,900 from the Hamilton County Planning and Development Department to conduct the feasibility study.
  
The feasibility study includes two (2) recommendations based on the path design and the bridge crossing.  The recommended path design would include  the installation of a ten to twelve foot (10’ – 12’) shared use path along the south side of Loveland Madeira Business Corridor.  This location would allow the city to work with area businesses to create designated  parking areas for users of the path.  The  shared use path would travel the length of Loveland Madeira Road to the West Loveland  intersection.  A crossing at the West Loveland  or Wall Street intersection would need to be created as the recommended crossing of the bridge is on the north side and consequently riders need to move to  the north side of West Loveland Avenue as they approach the bridge.

While a stand-alone bridge, a modification to the existing bridge to create a cantilever type path were both examined, the most feasible and cost-effective crossing entails the modification of the existing lanes of traffic of the bridge to accommodate an expansion of the existing sidewalk.  The north side is the most feasible crossing side as it will allow for  less disruption of traffic and an easier left turn exit onto Karl Brown  towards Nisbet Park rather than a right onto Karl Brown which has limited right of  way and higher amounts of traffic.

City Council welcomes your thoughts on the plan and encourages residents to take time and view the plan Feasibility Study

Please feel free to contact our City Manager via email at dkennedy@lovelandoh.gov with any thoughts.

City of Loveland Mayor & Council

 

Facebook Twitter Email

Other News in City News

Doug Portmann Award

City Council Awards Volunteers

Posted on: March 30, 2023
Ryan Wedmore 3-28-23

City Welcomes New Officer

Posted on: March 30, 2023
Flock Safety

LPD Utilizes Flock Safety Technology

Posted on: March 23, 2023
Tree Pickup

Free Tree Giveaway Opens April 10

Posted on: March 20, 2023
Arbor Day (Facebook Post)

Arbor Day Tree Scavenger Hunt

Posted on: March 13, 2023
Traffic Signal Box Peter Sexton

Call for Art

Posted on: March 1, 2023
Bike Trail Bridge near Nisbet

Bike Trail Bridge Closure

Posted on: February 20, 2023